|
|
|||
|
|
The following is a draft document prepared by Margaret Hayes of
Archaeological Research, Inc. This is a working document that
changes on a regular basis.
A. Location B. Owner C. Use D. Significance
Part One: Historical Information A. Physical History 1. Date of Erection 2. Engineers 3. Original and subsequent owners 4. Builder, contractor, suppliers 5. Original Plans and construction 6. Alterations and Additions B. Historical Background
Part TWO: Engineering Information A. Architectural Character B. Condition of Fabric C. Description of superstructure D. Description of substructure E. Description of piers F. Description of abutments G. Engineering approaches H. Site
|
||
|
Last updated 07/20/2004 10:02 AM |
|||